Construction of high-voltage transmission lines – “Tskhaltubo-Akhaltsikhe” and “Akhaltsikhe-Tortum”

Construction of high-voltage transmission lines – “Tskhaltubo-Akhaltsikhe” and “Akhaltsikhe-Tortum”

Within the framework of the project, the following OHLs will be built:

  • 500 kV high-voltage transmission line “Tskhaltubo-Akhaltsikhe” with а Length of 103 km
  • 400 kV Akhaltsikhe-Tortum high-voltage transmission line with a length of 34 km, Connection of Georgia-Turkey energy systems

The project will allow to provide another opportunity for use of Georgia`s rich hydro power resources.

after that:

  • Due to this, the Georgian electricity system’s interconnection with both Europe and Turkey will be strengthened.
  • The capacity and efficiency of the Georgia’s power network will greatly enhance after the project is completed.
  • For the 500kV power network Enguri-Zestaponi-Akhaltsikhe, a significant reserve network will be generated.
  • At the same time shutdowns and the amount of electricity that is not supplied will be reduced, that will, in turn, make cross-border trade easier.

Customer: JSC GSE

Contractor: International construction company KEC International Limited

Subcontractor: JSC Energony

Funding: KfW Development Bank

The German consulting company Fichtner GmbH will provide supervision/engineering services.

The construction of the high voltage transmission lines will be completed in 2025

Project Info

Date: